New incinerator rules under fire from Fraser Valley

FVRD objects as province prepares to approve revised conditions for Metro Vancouver waste-to-energy plant

Aerial view of Metro Vancouver waste-to-energy plant in south Burnaby.

The B.C. government is poised to approve new standards for how Metro Vancouver’s garbage incinerator must operate and report its emissions.

And the Fraser Valley Regional District is objecting, saying the revised rules will not be tough enough.

“The provisions are far from world-leading,” said Chilliwack Mayor Sharon Gaetz, chair of the FVRD board, adding her regional district’s concerns have been “underestimated, brushed off and not answered” by both Metro and the provincial environment ministry.

After a two-year process, the province has unveiled a draft new operational certificate for the existing WTE plant and it’s gone through a final 30-day public comment period.

The FVRD has responded with a long list of deficiencies.

Valley politicians have long fought both the existing waste-to-energy plant in Burnaby as well as Metro’s strategy to build a new one as it shifts away from landfilling garbage.

Gaetz maintains the existing plant poses a significant air pollution threat to the Fraser Valley and the province’s approach to updating its operating requirements sends a “concerning” signal of how it may go about approving a new Metro incinerator.

“If this is approved, I’d be incredulous,” she said.

Among the FVRD’s demands are that the WTE plant adopt continuous monitoring of air pollutants, instead of periodic testing, where results might appear cleaner if a different grade of garbage is burned on the test day.

They also want testing for a broader range of substances, and more study of the incinerator’s impacts on soil, water quality, vegetation and crops.

Gaetz said the new draft certificate would actually relax some of the existing monitoring requirements – Metro’s plant would no longer have to test for substances like antimony, cobalt, copper and nickel.

The proposed certificate will require specific management plans to be drafted for fly ash and bottom ash, and for publishing monitoring data online, but the FVRD argues those should be in place before the renewal is approved, not months later.

And the FVRD wants the environment ministry to state whether and when it would audit the plant, and clearly indicate what penalties will apply for non-compliance.

Cadmium has been found in the incinerator’s bottom ash – it’s believed to come from batteries that get burned, despite attempts to get Metro residents to recycle them.

“We know that’s up in the air and people have been breathing it,” Gaetz said. “We know what cadmium does to people. We know what nickel does to people. We know that what’s coming out of the stack is harmful to human health.”

Instead of a new certificate that could effectively freeze monitoring requirements for decades, Gaetz said, the FVRD would prefer a phase out of the plant, which burns 285,000 tonnes of waste per year.

“I have serious concerns with any incineration. It’s backwards, old-fashioned technology that has had its day and should be gone,” she said.

“If we had our wish, it would be shut down and Metro would have another plan in place to be able to deal with the garbage rather than burning it and putting it in a landfill in the sky.”

Richmond Mayor Malcolm Brodie, chair of Metro’s zero waste committee, called the FVRD position “unfortunate.”

He said Metro has made major upgrades in the last couple of years to “dramatically” reduce the emissions the waste-to-energy plant releases.

The latest $7 million retrofit cut nitrogen oxide emissions by half. The plant now accounts for 0.4 per cent of the NOx emitted in the region, down from 0.8 per cent in 2014.

“We’ve been investing significant dollars bringing up the environmental performance of that facility,” Brodie said, adding Metro remains committed to continuous improvement.

“I believe the most environmentally friendly solution for our solid waste and the most cost-effective is waste-to-energy.”

 

 

A load of garbage is hoisted at Metro Vancouver’s Waste To Energy Facility in Burnaby.Black Press file photo.

Just Posted

Cloverdale nurse, Langley truck driver awarded for saving a police officer’s life

Angela Feltrin and Earl Hanes thanked by B.C. RCMP’s top cop

Annual Aldergrove Fair announces 2019 theme: ‘Aldy on the Moon’

The fair is gathering space memorabilia as well as some of the people involved in the space program.

Aldergrove’s Fraser Highway to unveil another Starbucks

A commercial building on Fraser Highway will open its doors to two businesses instead of one.

Former Surrey mayor Bill Vogel dead at age 87

Vogel was Surrey’s 31st mayor, in the big chair from 1978 to 1980, and was alderman from 1973 to 1977

Langley woman’s caregivers pen unflinching book about her struggles

The authors and the woman they care for will be at an Abbotsford book signing on Saturday, Feb. 16.

VIDEO: How much snow do you have?

Langley residents are being asked to share images of their snow to enter for a $20 coffee card.

Judge rules Abbotsford home must be sold after son tries to evict mom

Mom to get back down payment and initial expenses

Mayors approve SkyTrain extension to UBC

Next step is a business plan and public consultation

Trump officially declares national emergency to build border wall

President plans to siphon billions from federal military construction and counterdrug efforts

Snow turns to slush, rain as it warms up across B.C.’s south coast

Some areas are already covered by more than half a metre of snow following three separate storms

Father to be charged with first-degree murder in Amber Alert case

11-year-old Riya Rajkumar was found dead in her father’s home in Brampton, Ontario

Police track armed kidnapping across Thompson-Okanagan

RCMP allege it was a targeted crime believed to be linked to the drug trade

St. Paul’s Hospital replacement slated to open in Vancouver in 2026

Announced many times, but this time there’s money, Adrian Dix says

Fourteen ‘dream’ homes ordered evacuated as sinkholes open in Sechelt

Sinkholes throughout the subdivision have prompted the District of Sechelt to issue evacuation orders

Most Read